CONSTRUCTION

Construction Phase 1- Site Preparation/ Improvements

  • Remove trees, extra fill or blast rock if needed.
  • Sewer and water lines are installed
  • Dig hole
  • Place concrete footings
  • Concrete walls are poured.
  • Backfill
  • Electrical service is installed
  • Underground plumbing is performed

Construction Phase 2- Rough Construction

  • Framing
  • Placement of all doors and windows
  • Fireplaces installed
  • Roofing
  • Siding
  • Brick/Stone

Construction Phase 3- Electrical, Plumbing, Insulation, HVAC

  • Rough plumbing
  • Electrical walk through
  • Media wiring
  • HVAC systems installed
  • Central Vac
  • Insulation

Construction Phase 4- Sheetrocking/Tile/ Hardwood

  • Sheetrock/Plastering
  • Painting
  • Tile floors and showers
  • Hardwood floors
  • Interior Brick or stone
  • Cabinetry installed
  • Countertops installed

Construction Phase 5- Finish Carpentry

  • Install door frames and doors.
  • Install base trim and window casing.
  • Build staircases and install railing.
  • Trim out any tray ceilings or any other finish carpentry work
  • Door handles

Construction Phase 6- Finishing

  • Install all plumbing fixtures
  • Install all lighting fixtures
  • Carpeting Final cleaning
  • Walk through with builder